Hot water vessel - Installation
Need to replacing a hot water cylinder within an unvented hot water storage system ? i.e. a system supplied directly from the water mains with no open-ended pipe for venting and with a storage capacity greater than 15 litres. The Building regulation requirements are for hot water to be safely stored under pressure and for the installation to be energy efficient. The cylinder should be installed by a person competent to do so. We are fully insured and competent to carry out these works all our engineers are CITB and ACS registered.
We can supply and fit a number of hot water cylinders & vessels at present you can book the supply and fitting of a 125-145ltr Mega flow hot water cylinder Dircet (D) (DD) or Indirect (CL) from below
Don't for get when you have your Mega flow installed by Central Heating online booking you get a 25yr manufactures guarantee
Book your Services Here Now
Please read and agree to Terms & Conditions you will need to check the box in the cart from Mal's ecommerce to agree. Please don't for get to ad your desired appointment Time & Date.
Heatrae Megaflow HE Direct Unvented Cylinder D70L
DIRECT These models are heated entirely by electrical supply. For domestic use these take advantage of economy 7 tarrifs
Heatrae Megaflow HE Indirect Unvented Cylinder CL70L
INDIRECT These models are designed with a heat exchanging coil inside for use in conjunction with central heating boilers. An electrical heating..
Heatrae Megaflow HE Direct Unvented Cylinder D125L
Heatrae Megaflow HE Indirect Unvented Cylinder CL125L
Heatrae Megaflow HE Direct Unvented Cylinder DD145L
Heatrae Megaflow HE Direct Unvented Cylinder CL145L
Please Note: Cylinder relocations and complete New Cylinder Installations must be with in 1.5m of all required pipe work, additional costs may be add. If Asbestos is found on site and is an obstruction, the customer will be required to remove the asbestos by a qualified Asbestos removal company or contractor. An Air Quality test certificate must be displayed upon re-instatement of works. For more in formation please visite HSE.GOV.UK for more details. Please allow up to five working day to deliver installation service from date of booking.
|